Platform 05 · Drainage & flood control
Downstream: every new rooftop adds runoff, and everyone already here borrows to handle it.
A growth-pays-its-way framework for El Paso drainage and flood-control infrastructure.
Leer en español$7.42
the monthly stormwater fee every existing customer pays — up from $3 when the fee began. New subdivisions pay no one-time share of the capacity they add.
In short
El Paso's stormwater system runs almost entirely on a recurring monthly fee paid by existing customers — now $7.42, up from $3 when it began. There is no one-time charge on new subdivisions for the drainage and flood-control capacity their pavement and rooftops require, so every new arroyo crossing and detention pond is paid for by raising the bill on people who already live here — or by borrowing against their future bills. The 2009 stormwater master plan identified $650 million in needed projects; about $362 million has been built since 2008, with growth continuously adding new demand on top of the backlog. The fix already exists in Texas law: the same chapter that authorizes El Paso's water, sewer and roadway impact fees lists storm water, drainage and flood control as an eligible category for any home-rule city. What is missing is the study that would set the number — El Paso has never commissioned one for stormwater. This plan commissions it on the same timeline and procurement as the roadway study, so the City pays for one consultant engagement rather than two, and for the first time sets drainage policy knowing which share of the cost growth is actually causing.
The numbers
Figure 1
The monthly stormwater fee every existing customer pays — then and now
The fee has more than doubled since it began. New subdivisions pay no one-time share of the capacity they add.
Figure 2
The 2009 master plan's need, against what has been built
Roughly $288 million outstanding against the original estimate alone — before the capacity growth has added since.
"New subdivisions shouldn't get to add pavement and rooftops and send the flood-control bill downstream to everyone who already lives here — growth should pay for the drainage capacity it requires, the same way we ask it to on our water lines and our roads."
Read the whole plan
The full paper runs 12 pages: the problem in detail, what the City can lawfully do about it, what would actually happen, and the charts behind every number on this page.
↓Download the full planPDF · 12 pagesReceipts, not rhetoric
Sources
Election Day is November 3, 2026
Make a plan to vote
Registration closes October 5. Early voting runs October 19–30. Election Day is Tuesday, November 3. Check your registration and find your polling place at VoteTexas.gov or the El Paso County Elections Department.
Check your registration →El Paso County Elections
Get the plans in your inbox
One email when a new plan, a correction, or a vote worth knowing about goes up. Nothing else.